Biomass & Waste-to-Energy

Whether based on solid biomass or non-recyclable waste, energy production infrastructure provides heat — and, where relevant, electricity — available on a continuous basis and independent of weather conditions, using locally available resources. These assets meet a wide range of energy needs, from industrial heat production to district heating networks.

We invest in energy production infrastructure based on biomass and waste capable of delivering stable and dispatchable thermal energy, essential for the continuous operation of industrial sites and the development of district heating networks. These installations represent long-term energy assets that strengthen security of supply and enhance the robustness of energy systems.

Deployment of biomass boilers and waste-to-energy plants capable of operating in combined heat and power (CHP) or trigeneration mode, ensuring the supply of heat — and, when required, cooling or electricity — to district heating networks and industrial sites: reliable infrastructure designed to meet energy needs on a continuous basis.

114 MW

Installed capacity

69

Sites

650 GWh

Annual production

41%

Portfolio share

Capshare

Capshare

Country
Technology
Biomasse & Waste-to-Energy
Signing Date
2026
Status
In Operation
Installed Capacity
72 MW
Production or Savings
323,713 MWh / year
MoyPark

MoyPark

Country
Technology
Biomass & Waste-to-Energy
Signing Date
2026
Status
In Operation
Installed Capacity
17.2 MW
Production or Savings
7,269 MWh / year
CPP1

CPP1

Country
Technology
Biomass & Waste-to-Energy
Signing Date
2026
Status
In Operation
Installed Capacity
1.26 MW
Production or Savings
na
Stellantis Biomass Serbia

Stellantis Biomass Serbia

Country
Technology
Biomass & Waste-to-Energy
Signing Date
2025
Status
Under Construction
Installed Capacity
12 MW
Production or Savings
38,000 MWh / year
Paper Plant Condat

Paper Plant Condat

Country
Technology
Biomass & Waste-to-Energy
Signing Date
2023
Status
Under Construction
Installed Capacity
32 MW
Production or Savings
255,000 MWh / year
Somelos

Somelos

Country
Technology
Biomass & Waste-to-Energy
Signing Date
2023
Status
Under Construction
Installed Capacity
7.5 MW
Production or Savings
19,600 MWh / year
Skylark II

Skylark II

Country
Technology
Biomass & Waste-to-Energy
Signing Date
2022
Status
Under Construction
Installed Capacity
32.0 MW
Production or Savings
244,800 MWh / year
Halley’s Feeds

Halley’s Feeds

Country
Technology
Biomass & Waste-to-Energy
Signing Date
2022
Status
In Operation
Installed Capacity
3.0 MW
Production or Savings
12,000 MWh / year
Modul’O Yvelines

Modul’O Yvelines

Country
Technology
Biomass & Waste-to-Energy
Signing Date
2022
Status
In Operation
Installed Capacity
0.2 MW
Production or Savings
2,500 MWh / year
Vida Mar

Vida Mar

Country
Technology
Biomass & Waste-to-Energy
Signing Date
2021
Status
In Operation
Installed Capacity
1.5 MW
Production or Savings
1,400 MWh / year
Chiltern

Chiltern

Country
Technology
Biomass & Waste-to-Energy
Signing Date
2021
Status
Under Construction
Installed Capacity
1.7 MW
Production or Savings
6,700 MWh / year
Speyside

Speyside

Country
Technology
Biomass & Waste-to-Energy
Signing Date
2021
Status
Under Construction
Installed Capacity
0.5 MW
Production or Savings
1,500 MWh / year
Inshriach

Inshriach

Country
Technology
Biomass & Waste-to-Energy
Signing Date
2021
Status
In Operation
Installed Capacity
1.3 MW
Production or Savings
9,300 MWh / year
Woodgate

Woodgate

Country
Technology
Biomass & Waste-to-Energy
Signing Date
2020
Status
In Operation
Installed Capacity
1.3 MW
Production or Savings
6,900 MWh / year
Skylark I

Skylark I

Country
Technology
Biomass & Waste-to-Energy
Signing Date
2020
Status
In Operation
Installed Capacity
3.7 MW
Production or Savings
29,400 MWh / year
Renewable Heat Generation

Renewable Heat Generation

Country
Technology
Biomass & Waste-to-Energy
Signing Date
2019
Status
In Operation
Installed Capacity
9.0 MW
Production or Savings
23,200 MWh / year
Park Lane Centre

Park Lane Centre

Country
Technology
Biomass & Waste-to-Energy
Signing Date
2019
Status
In Operation
Installed Capacity
0.2 MW
Production or Savings
300 MWh / year
Thomas Alleyne Academy

Thomas Alleyne Academy

Country
Technology
Biomass & Waste-to-Energy
Signature Date
2018
Status
In Operation
Installed Capacity
0.9 MW
Production or Savings
1,700 MWh / year
LCH Hotels

LCH Hotels

Country
Technology
Biomass & Waste-to-Energy
Signing Date
2017
Status
In Operation
Installed Capacity
2.9 MW
Production or Savings
9,600 MWh / year
CWC

CWC

Country
Technology
Biomass & Waste-to-Energy
Signing Date
2017
Status
In Operation
Installed Capacity
3.0 MW
Production or Savings
23,000 MWh / year
École des Roches

École des Roches

Country
Technology
Biomass & Waste-to-Energy
Signing Date
2016
Status
In Operation
Installed Capacity
1.4 MW
Production or Savings
3,200 MWh / year