Manor Farm Heat Pump

Country
Technology
Heat electrification & Flexibility
Signing Date
2025
Status
Under Construction
Installed Capacity
1.00 MW
Production or Savings
5,810

no image added yet.

Manor Farm

Country
Technology
Heat electrification & Flexibility
Signing Date
2024
Status
Under Construction
Installed Capacity
2.41 MWe
Production or Savings
640 MWh / year

no image added yet.

PG6 – Phase II

Country
Technology
Heat electrification & Flexibility
Signing Date
2024
Status
Under Construction
Installed Capacity
6.4 MWe
Production or Savings
5,440 MWh / year

no image added yet.

Forvia Pitesti

Country
Technology
Heat electrification & Flexibility
Signing Date
2024
Status
Under Construction
Installed Capacity
2.1 MW
Production or Savings
3,000 MWh / year

no image added yet.

HVO Generation

Country
Technology
Heat electrification & Flexibility
Signing Date
2023
Status
Under Construction
Installed Capacity
5.3 MWe
Production or Savings
600 MWhe / year

no image added yet.

NI Generator II

Country
Technology
Heat electrification & Flexibility
Signing Date
2023
Status
Under Construction
Installed Capacity
3.2 MWe
Production or Savings
400 MWhe / year

no image added yet.

HeatCube Tisza

Country
Technology
Heat electrification & Flexibility
Signing Date
2023
Status
Under Construction
Installed Capacity
7.5 MWe
Production or Savings
29,700 MWhth / year

no image added yet.

Forvia Gorzów II

Country
Technology
Heat electrification & Flexibility
Signing Date
2023
Status
Under Construction
Installed Capacity
1.9 MW
Production or Savings
1,700 MWh / year

no image added yet.

NI Generator I

Country
Technology
Heat electrification & Flexibility
Signing Date
2023
Status
Under Construction
Installed Capacity
12.8 MWe
Production or Savings
1,600 MWhe / year

no image added yet.

Forvia Gorzów I

Country
Technology
Heat electrification & Flexibility
Signing Date
2021
Status
In Operation
Installed Capacity
1.1 MW
Production or Savings
2,700 MWh / year