Capshare
Country
Portugal
Technology
Biomass
Signing date
April 2026
Status
In Operation
Installed Capacity
72 MW
Production or Savings
323,713 MWh / year
Client
Sonae Arauco Portugal (SAPT) / DGEG
Sector
Industry